|
Representative Project
SHRINERS BURN CENTER
Boston, Massachusetts
High-rise Roofing
To install a 25,400 sq. ft. asphalt and gravel built-up roof on this newly elevated 11 story building, marshall hoisted an asphalt kettle up to the roof deck. An intricate multi-pitched, tapered insualtion system was designed and installed to direct the water flow to 30 roof drains. Custom sheetmetal work included installing a metal wall coping designed to finish off radius wall panels.
Back to Projects  |